Westpark Tollway, Extension Project E5, Harris County Toll Road Authority
Harris County,TX
Responsible for the 4R P.S.&E. roadway design of approximately one (1) mile new location controlled access 4-lane urban toll road including frontage roads and entrance/exit ramps. Design supervision responsibilities include roadway geometric design, Typical Sections, and proposed roadway cross sections, Hydraulic Analysis, detention pond, storm sewer design, traffic control plan, signing, pavement marking and channelization, as well as, preparation of plans, estimates and quantities.
Same Team. Stronger Brand. Now DCCM.
RG Miller | DCCM is now part of a single, streamlined DCCM brand. You’ll find all the same expertise and project experience at www.DCCM.com.
This site will be sunset soon, so be sure to update your links.