Project limits from Kingwood Drive to Sorter-McClellan Rd. The total length of the project is 1.3 miles. Reconstruction of an existing two-lane undivided rural roadway to a four-lane divided rural facility with open ditches. Developed roadway geometric design and proposed roadway cross-sections. Designed storm sewer system and delineated drainage areas.
Same Team. Stronger Brand. Now DCCM.
RG Miller | DCCM is now part of a single, streamlined DCCM brand. You’ll find all the same expertise and project experience at www.DCCM.com.
This site will be sunset soon, so be sure to update your links.