Transportation

Cypress Rose Hill Road

Cypress Rose Hill Road Cypress,TX Reconstruction of Cypress Rose Hill in northwest Harris County from a 2-lane asphalt open ditch section to a 4-lane concrete boulevard with side swales, storm sewers and two detention basins. The new road was designed to have the same Level of Service during extreme events as the existing road as the road traverses across a wide floodplain and through the floodway of Willow Creek. The two detention basins, being a combined 40 ac-ft of storage, are designed to mitigate any adverse impacts from the road improvements.  

Freeport Street, Phase I

Freeport Street, Phase I Freeport,TX Reconstruction of Freeport Street from Woodforest to Uvalde including additional storm sewer/upgrading of storm sewers to alleviate occurrence of 1% (100-yr.) flooding in the neighborhood area. Project work also included the rework of numerous HCFCD Channels and Street Culvert Crossings to also convey the various storm events more efficiently. Included in the Project was the replacement of existing 2 lane concrete paving with new 2-lane concrete paving from Woodforest to Uvalde. Project was completed on time for a construction cost of $3,200,894.35  

Houston Heights Neighborhood Street Reconstruction

Houston Heights Neighborhood Street Reconstruction Houston,TX This project involves the reconstruction of over 12,000 linear feet of city streets bounded by White Oak Bayou on the north, Studemont Street on the east, Washington Avenue on the south and Harvard Street on the west. Several waterlines and a full upgrade to the wastewater system are also included is the project.  

Freeport Street, Phase II

Freeport Street, Phase II Freeport,TX Reconstruction of Freeport Street from IH 10 to Holly Park from an existing 2-lane asphalt pavement with open ditch/small lateral culvert system to 2-lane with continuous left turn lane, concrete curb and gutter and storm sewer system. Storm sewer system included three offsite systems, a new HCFCD concrete low flow channel, and upgrading numerous HCFCD channel crossings all to alleviate occurrence of 1% (100-yr.) flooding in the neighborhood area.  

Wirt Road

Wirt Road Houston,TX This project consisted of 4,850 linear feet of Neighborhood Street Reconstruction (NSR) and 3,310 linear feet of major thoroughfare (Wirt Road) reconstruction. The NSR consisted of the reconstruction of asphalt open ditch to concrete curb and gutter with sidewalks. The neighborhood NSR was converted to underground storm sewer and as this is at the upper limit of the Wirt Road Storm System, a smaller parallel system was placed on Wirt and then interconnected downstream to convey the flows along Wirt.  

Fairfield Place

Fairfield Place Houston,TX This project included addition of approximately 2,500 linear feet of two (2) lanes of concrete pavement along a major thoroughfare, Fairfield Place Drive, from Cumberland Ridge Drive to Schiel Road. This project included concrete curb and gutters to complete the boulevard section along with storm sewer leads and inlets.  