Dowdell P.U.D. Wastewater Treatment Plant & Lift Station
Houston, TX
Existing 0.5 MGD permanent concrete plant was built in 2004 and design is underway to build another identical plant to bring the plant capacity up to 1.0 MGD. The site is located within the floodplain of Willow Creek, which required elevating the plant and lift station.
Same Team. Stronger Brand. Now DCCM.
RG Miller | DCCM is now part of a single, streamlined DCCM brand. You’ll find all the same expertise and project experience at www.DCCM.com.
This site will be sunset soon, so be sure to update your links.