Old Dominion

Houston,TX

The Old Dominion Truck terminal is located on Aldine Bender road and is situated on 23.2 Acres of land. The project required design of a detention/mitigation pond as well as onsite storm, water, and sanitary sewer. RG Miller | DCCM worked with the MUD District Engineer on the annexation of the site into the district. Water and sanitary were served from a well and spray field respectively. When the site was annexed the entire project was converted over to the MUD utilities. Coordination with Harris County, City of Houston and TXDOT was required for this project.

 
Scroll to Top