Reconstruction of Freeport Street from IH 10 to Holly Park from an existing 2-lane asphalt pavement with open ditch/small lateral culvert system to 2-lane with continuous left turn lane, concrete curb and gutter and storm sewer system. Storm sewer system included three offsite systems, a new HCFCD concrete low flow channel, and upgrading numerous HCFCD channel crossings all to alleviate occurrence of 1% (100-yr.) flooding in the neighborhood area.
Same Team. Stronger Brand. Now DCCM.
RG Miller | DCCM is now part of a single, streamlined DCCM brand. You’ll find all the same expertise and project experience at www.DCCM.com.
This site will be sunset soon, so be sure to update your links.